Skip to content

Industries · Agriculture

Plastic products and components for agriculture

Agriculture accounts for 5% of our output. We mould farm and field products — egg trays, plastic chains and links, bird-spike strips and utility boxes — alongside enclosures, fluid parts and insert-moulded components for agricultural and off-highway equipment.

5%

of Solutech's current output

Platforms

  • Farm & poultry Egg trays, chains & links
  • Field & crop protection Bird spikes & utility boxes
  • Agri & off-highway equipment Tractors & construction

Component categories

  • 01Egg trays
  • 02Plastic chains & links
  • 03Bird-spike strips
  • 04Utility boxes
  • 05Electrical enclosures
  • 06Fluid & fuel management parts

Component categories describe our capability; they do not imply supply to any specific OEM.

Products

Parts we make for agriculture

Red and green moulded egg trays Agriculture

Egg Trays

Stackable egg trays in multiple colours

Process
Injection moulding
Type
Tray / base
Orange, white and green plastic chains with links Agriculture

Plastic Chains & Links

Plastic chains, connecting links and rings

Process
Injection moulding
Type
Chain
Bird spike strip with steel spikes in a moulded base Agriculture

Bird Spikes

Bird-deterrent spike strips with moulded base

Process
Injection moulding, Insert moulding
Type
Spike strip
Yellow and grey moulded boxes with base plates Agriculture

Utility Boxes

Moulded boxes with base plate

Process
Injection moulding
Type
Enclosure

Engagement

From RFQ to series production

  1. Week 0–2

    Discovery & RFQ

    Component shortlist, drawings and CAD sharing, technical clarifications, commercial RFQ for the first 3–5 priority parts.

    Weeks 0 to 2
  2. Week 2–6

    Tooling & prototype

    In-house tool design and manufacture, T1 sample submission, dimensional inspection report and material qualification.

    Weeks 2 to 6
  3. Week 6–10

    PPAP & validation

    PPAP documentation, IMDS submission, capability studies, vendor audit and on-site OEM QA verification.

    Weeks 6 to 10
  4. Week 10–16

    Series production

    SOP for first parts, gradual line-feed integration, expansion to additional categories, JIT delivery set-up.

    Weeks 10 to 16

A structured, low-risk path from first conversation to SOP — typically 12 to 16 weeks for the first parts.

Let's build together

Have a part, a drawing or a programme in mind?

Share your drawings or CAD data. Our engineering team reviews every RFQ for feasibility, tooling and moulding before we quote.

Call Request a Quote